Cahaba Heights Space Reno Wks 4-7

It's good to be back here with some pictures and a review of what's happening with this extensive space renovation.  The electricians have rewired just about everything.  That took some time as you can imagine. 

The walls have been covered in sheetrock and finished up.  The flooring has just been put down last week.  The outdoor deck in back has been constructed as well.  

Things will move a lot faster now that these things are all in place.

 

Now for some painting, installing cabinets, and more fixtures.