Week 7 - Ranch Renovation

A lot has come together this week. Countertops...and one appliance moved into position. Many things are not evident by images.  Things like plumbing, and electrical.

IMG_3666.JPG

Kitchen countertops - Carrara marble

IMG_3667.JPG

Close up of marble island top

IMG_3668.JPG

One bowl sink

IMG_3713.JPG

 There hasn't been much time for clean up.

IMG_3715.JPG
IMG_3714.JPG

Now for the master bathroom - same Carrara from the 2 slabs used by the kitchen.

IMG_3669.JPG

countertops

IMG_3670.JPG

master bath

IMG_3671.JPG

threshold

The hall bathroom now has its quartz countertop.  The sink fixture is just sitting up there for looks right now.

IMG_3717.JPG

Hall bathroom

IMG_3664.JPG

Quartz

IMG_3663.JPG

Now for the outdoors:  there is the matter of the empty swimming pool with broken liner.

DSC_1030a.JPG

Empty pool

The pool liner must be installed soon.  A few choices:

IMG_3582.JPG
IMG_3586.JPG
IMG_3583.JPG

How the pool looked filled with water in the summer

575001-26.jpg

Next post we will have more cabinet pulls, lighting, and hardwood flooring getting refinished.  There may be more appliances put in place.