Week 3 Continued - Ranch Renovation

Sheet rock is up. And new doors are in. Also recessed lighting is in.

photo.JPG

new doors 1

DSC_0143.JPG

family room

DSC_0145.JPG

french doors

Hall bathroom tile is being put down, on the floor and around the bath tub.

photo 5.JPG

subway tile bath

DSC_0148.JPG

tub

Kitchen and bathroom fixtures have arrived.  Danze "Reef" for bathrooms.

photo 2.JPG
photo 3.JPG

Danzekitchen sink faucet

photo 4.JPG
photo 1.JPG

 

Entryway

DSC_0142.JPG

entryway

Back wall of master bedroom closet is up

DSC_0151.JPG

closet

Coming up next for week 4:  Master bathroom tile flooring and shower, mud on sheet rock throughout, wall paint, hall bathroom cabinets, new windows, and possibly the delivery of kitchen cabinets.