Week 2 - Ranch Renovation continued

Master Bathroom

This renovation includes three major areas of space in the home:   a new master bathroom, a hall bathroom replaced, and entire kitchen replaced.

The master bathroom is being created from scratch into existing space.  New plumbing is needed as there was not any in existence in the former space.  All of the electrical and plumbing has been put in this week. 

An interesting part of that would be the linear shower drain.

DSC_0135.JPG

linear drain 2

DSC_0136.JPG

linear drain 1

Basement

The baement is going to be a low priority with this renovation.  Right now the walls are paneled throughout.  For a temporary update they are being primed and painted.  So far they are primed.